• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki Can you bill a 24 and a 25 on same date

carol52

Guest
Messages
266
Location
Fayetteville, Arkansas
Best answers
0
If the pt is in a global and a minor procedure is done durring that 90 day global , what modifiers should be used ?
 
I don't understand:confused:...Are you saying that a procedure was done, or an E/M?
If the patient had a major procedure w/a 90 day global period, and you have...

...an E/M ONLY during the post-op period, you will need a 24 modifier on the E/M.

...a minor procedure only (All of these examples are assuming that the provider is the one who performed the first surgery, by the way): the minor procedure will need a 79 modifier. 24 & 25 only go on E/M codes.

...a minor procedure AND a significant/separately identifiable E/M on the same day: Yes, the E/M will need both a 24 and a 25, and the procedure needs a 79, as long as the procedure code is one with a global period of its own (I just learned that some of the codes starting at 12001 no longer have global periods, so check your NCCI edit tables here:http://www.cms.gov/NationalCorrectCodInitEd/NCCIEP/list.asp). If the minor procedure doesn't have a global period and doesn't bundle to your E/M code, then just put a 24 on the E/M and a 79 on the procedure.

I hope that helps!;)
 
Last edited:
Thanks

I billed out the 24 for a major global period, a 25 for E&M for the same day as a procedure and a 79. This was all on the same dos. Medicaid denied for 24.
 
Top