• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki E&M With Fracture Care

dwilleycpc

Guest
Messages
1
Best answers
0
Is it correct coding to Code for a E&M when billing for Fracture Care? I have a Ortho Doctor that will bill a E&M with the DX for 729.5 when a Fracture is billed.
 
Typically, you can bill an E/M with fracture care if:

1. The E/M occurs on the same day of or the day before the surgical procedure.

2. The E/M service directly prompted the surgeon's decision to perform surgery. (Modifier 57-Decision for surgery)

3. The surgical procedure following the E/M has a 90-day global period. In your case, fracture care.

Normally, you don't need a different DX (in your case-729.5) for the E/M to be paid but some carriers can be problematic. (Appeal in this case).
 
Top