• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki New Bundling rule

jmessick

Guest
Messages
16
Best answers
0
Effective 7-01-2013 E/M codes are being bundled with procedures with 00-10 day global! Does anyone have any thoughts or direct links that possible would help with determining if E/M would be justified if our patients expect a full body exam due to history of skin cancer. I can't imagine if our doctors do this and feel the need to do a procedure we are not able to bill for an E/M.

Thanks
 
Our understanding is that you ignore all examination/evaluation that leads up to the biopsy or cryosurgery, and then see if there is a medically necessary E/M documented for another diagnosis. We are trying the V10.82/V10.83 for personal hx of skin cancer/melanoma but unless there is a another bonifide diagnosis with appropriate HPI, exam, MDM etc then no E/M is going to be allowed. It's quite shocking, but true. The exam and MDM etc to determine that a biopsy of a lesion is needed during the course of a full skin exam is now included in the biopsy code (and other 10 day global period codes).
 
Thanks, After talking to a member of AAD this is correct. I would like to add because I can pick our notes in so many different ways.
What would you do if a new patient comes in with rash. Examed multiple body areas gave a prescription along with doing a biopsy to diagnosis rash. Would you bill E/M?
 
I read through these articles from AAD and found them extremely helpful. I love how simple it is put " One should subtract the entire E/M component included in a given procedure's valuation and then see what amount of E/M service is left. If nothing is left, then a separate E/M billing is inappropriate. The amount of what is left “stands alone” and is used to determine the level of E/M service to be billed with the 25 modifier. "


http://www.aad.org/dw/monthly/2013/june/to-25-or-not-part-one#.UfEoOG1nJkc
and
http://www.aad.org/dw/monthly/2013/july/to-25-or-not-part-two#allpages
 
Top