milleap
New
May we bill a 59025 mod 26 and a 99219 on the same day? I'm coming up with 2 different answers: 1. 99219 is in the global period so it's valuing at $0 and the 59025 is paying. (This is per our contract mgmt system and they are saying the 59025 has 000 days in the global period - which to me means it should always pay for it has 0 days, but they are valuing it with an amount but valuing the 99219 at $0) 2. The 59025 should not have been billed at all for it's included in the observation.
Thanks
Thanks