• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki DOS spans two days

Messages
7
Location
Carlsbad, CA
Best answers
0
I'm coding a procedure that started late on one day, and ended the next morning. The handwritten and dictated reports are dated on the second day. What DOS should I use? I haven't been able to locate any resources (CMS preferably) to back up my decision. Any advice, and references if possible? Thanks!
 
I'm with Tessa, we've always used the date the procedure started as our date of service. The only time that I have done otherwise was in anesthesia, but our billing system required us to enter as two charge lines when the procedure cross the midnight hour.
 
Top