• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki modifier 57 -with fracture code

JLM929

Networker
Messages
37
Location
Allentown, PA
Best answers
0
I need some help regarding Modifier 57. there is some chatter in the office about this. if you come in a office with a new fracture would you put a 57 modifier on the ov with fracture code or modifier 25? when there is no decision for surgery. thanks for any feedback.
 
Great question! Technically since fx care has a 90 day global you use the 57 modifier, however some payers see is as a 25 since it is performed in the provider office. I say use the 57 then if the payer denies for modifier resubmit with the 25, I have had more success this way.
 
Modifier 57 Fact Sheet

Definition
Indicates an Evaluation and Management (E/M) service resulted in the initial decision to perform surgery either the day before a major surgery (90 day global) or the day of a major surgery.
Appropriate Usage
Append where the decision to perform surgery is made the day of or day before a major surgery during an E/M service
Append only to the E/M procedure code
Inappropriate Usage
Appending to a surgical procedure code
Appending to an E/M procedure code performed the same day as a minor surgery. When the decision to perform a minor procedure is done immediately before the service, it is considered a routine preoperative service and not billable in addition to the procedure.
Do not report for a preplanned or prescheduled surgery, or if the surgical procedure indicates performance in multiple sessions or stages.
Facts
Global period- The day before surgery, the day of the surgery and the number of days following the surgery as indicated on the MPFSDB. Often, a major surgery has a 90 day post operative period and a minor surgery has either a zero or a 10 day post operative period.
A preoperative period is the day before the surgery or the day of surgery.
When an E/M service resulting in the initial decision to perform major surgery is furnished during the post-operative period of another, unrelated procedure, the E/M service must be billed with both the 24 and 57 modifiers.
 
Top