MarineMom1
Contributor
Hi Everyone,
I need some help. We have a pt that had surgery (was suppose to be out pt surgery) but the pt ended up with post op complications and she ended up staying a total of 7 days. Another doctor also helped with the post op problem the pt had. My questions is may we charge for these extra days? The surgery has a 90 day global period. If so, which modifier would I use.
Thanks,
Marine Mom
I need some help. We have a pt that had surgery (was suppose to be out pt surgery) but the pt ended up with post op complications and she ended up staying a total of 7 days. Another doctor also helped with the post op problem the pt had. My questions is may we charge for these extra days? The surgery has a 90 day global period. If so, which modifier would I use.
Thanks,
Marine Mom