afryberger
Networker
I know I asked this before, i don't think I was as clear as to what i needed. I understand I'm going to have two DOS. What i don't understand is on the actual report from the provider, which are we to use. This is what we were told:" 11. Date of service should be considered from Signed/drafted date which is given at the bottom of the report and all the modifier should be append on the basis of Signed/drafted date. Don’t take exam date as date of service."I have never heard of this. Films have there own DOS. The report is the interpretation and report, so it would be the exam date. Sign can sign off whenever, after it goes through being transcribed, that doesn't make it the DOS. I feel crazy.