• If this is your first visit, be sure to check out the FAQ & read the forum rules. To view all forums, post or create a new thread, you must be an AAPC Member. If you are a member and have already registered for member area and forum access, you can log in by clicking here. If you've forgotten the password it can be reset on our sign in section by entering your registered Email Address or Username here. To start viewing messages, select the forum that you want to visit from the selection below..

Wiki Total hip AND revision in one setting

madgejones10

Guest
Messages
76
Location
Charlottesville, VA
Best answers
0
This is a real doozey! Pt. went in for total hip replacement. This was done, but in rotating the hip, it was unstable at the conclusion of the surgery. My ortho decided to revise to a larger cup size, new liner and new ball. How would you code this? 27130 and then 27137 with a "58" modifier or would you just code for a total revision 27134 ? I am SO CONFUSED!
 
You're right.......this is a doozey!! I wouldn't use modifier 58 for the revision since that's for a staged procedure. The CPT book I have says for tx of a problem that requires a return to the OR (eg, unanticipated clinical condition) use modifier 78. BUT, since it's done on the same day, not sure how that would pay out and if it's acceptable. Possibly 100% on the revision and then the 50% on the 27130...............??? Ultimately you may only get paid for the revision.
 
Top